Single small wind turbine standing in rolling green English farmland under overcast sky, sheep grazing in middle distance
Small Wind Turbine Installation · England

Guaranteed to generate.
Or we take it down.

We plant turbines on hilltops and farmland edges across England. Every installation comes with a signed performance guarantee, full planning management, and a 25-year structural warranty. The risk is ours.

147

Turbines installed

91%

Planning approval rate

25 yr

Structural warranty

£0

Upfront if refused

01
Performance Guarantee

Guaranteed output — or we take it down.

Every turbine we install comes with a signed generation guarantee. We specify the minimum annual kWh output before a single bolt is turned. If the turbine underperforms in year one, we remove it and refund your installation cost in full. No caveats. No small print.

  • Minimum 35,000 kWh/year for a 15kW tower on qualifying land
  • Independent metering from day one — your data, not ours
  • Annual review against signed performance schedule
  • Full removal and refund if year-one output falls short

Real Generation Data

12 months. 7 sites. Every one exceeded target.

Below: actual dashboard exports from six farms we commissioned in 2024. Average output was 41,200 kWh — 18% above the guaranteed minimum. The numbers are unedited.

41,200 kWh

Avg. annual output

7 / 7

Sites above guarantee

+18%

Above minimum (avg)

Wind turbine generation data dashboard showing kWh output across multiple farm sites

Generation data export — Fenwick Farm, North Yorkshire, Jan–Dec 2024

Planning Record

94 applications. 86 approved first time.

We publish our planning record openly. Below: the last 12 months of decisions, listed by local authority. Refused applications are included. You can see exactly where we've worked and how councils have responded.

94

Applications submitted

86

First-time approvals

91%

Success rate

Rural English farmland with planning boundary markers visible in green fields under grey sky

Planning approval — Stonebridge Farm, North Yorkshire, March 2025

02
Planning Guarantee

We handle planning. If it's refused, you pay nothing.

We prepare and submit your full planning application — site assessment, noise report, shadow-flicker study, heritage check. If the council refuses and appeal fails, you owe us nothing. We absorb the cost. Our approval rate across 94 rural applications is 91%.

  • Full application prepared and submitted by our planning team
  • Includes noise, shadow-flicker, ecology and heritage reports
  • 91% first-time approval rate across 94 rural applications
  • No fee if refused — we carry the planning risk entirely
03
Installation Guarantee

Generating within 7 weeks of ground-break. Guaranteed.

We give you a signed installation schedule before the first machine arrives on your land. If we miss the completion date by more than five working days, we credit your first year of maintenance free of charge. Our average installation time is 6.2 weeks from ground-break to first generation.

Week 1–2

Site survey and ground assessment

Week 3–4

Foundation excavation and concrete pour

Week 5–6

Tower erection and electrical connection

Week 7

Commissioning, metering and handover

6.2 wkAverage completion time

Installation Record

147 installations. Average 6.2 weeks. Zero late penalties paid.

We've never triggered our late-completion credit. Below: the signed schedule and completion certificate from Croft Hill Farm, Cumbria — installed in 41 working days, generating on day 42.

147

Installations completed

6.2

Average weeks to generate

0

Late penalties triggered

Wind turbine tower being erected on UK farmland with crane and construction crew visible

Tower erection — Croft Hill Farm, Cumbria, Week 5 of installation

Check My Land for Free

Free site assessment · No obligation · Results within 48 hours

Warranty Documentation

Engineer-certified. Council-registered. Yours for 25 years.

Every turbine is certified by a chartered structural engineer and registered with the local authority on completion. The warranty document is lodged with your title deeds. Below: example certification pack from Oakmere Farm, Cheshire.

Tower structure

25 years — certified to BS EN 61400

Blades & hub

10 years manufacturer warranty

Gearbox & generator

5 years, extendable to 10

Annual inspection

Included, years 1–5

Wind turbine base and tower close-up showing structural steel and engineering quality in green field

Structural inspection — Oakmere Farm, Cheshire, post-commissioning 2024

04
Structural Warranty

25 years, certified by a chartered engineer. Not just our word.

The tower structure carries a 25-year structural warranty, certified to BS EN 61400 and signed by a chartered civil engineer — not a sales document, a legal instrument lodged with your title deeds. Annual inspections are included in years one through five.

25-Year Asset

£312,000 average gross revenue over 25 years at current grid prices.

  • Average 25-year gross revenue: £312,000 at current grid prices
  • Landowner retains full ownership after installation payment
  • Transferable with land sale — adds asset value to property
  • Feed-in tariff or PPA options available at commissioning
Check My Land for Free

Free site assessment · No obligation · Results within 48 hours

The five things we put in writing before a single machine arrives on your land

01

Minimum generation output

02

Planning approval or no fee

03

Installation within 7 weeks

04

25-year structural warranty

05

Annual inspection, years 1–5

Check My Land for Free